Skip to main content

Projects

Overview

Koorda Bulk Storage Facility
Project Type Major Refurbishment Project
Facility 5800m2 Bulk Storage Facility
Location Koorda
Constructed 2005
Refurbished 2024

Koorda Bulk Storage Refurbishment x 2

In 2024, Promako was engaged to undertake a major refurbishment of 2 x bulk storage facilities in Koorda. The purpose of the refurbishment was to extend the storages operational life by an additional 25 years and ensuring continued high-performance service.

The comprehensive scope of works included:

  • High-volume washdown and thorough surface preparation
  • Removal of the existing seal using high-pressure water blasting
  • Complete removal and replacement of cladding
  • Major Structural repairs, including jacking of the roof structure to install a heavy duty RHS compression ring.
  • Application of specialised coatings to enable controlled atmosphere fumigation
  • Installation of control system fan interlocks

Practical Completion was achieved in October 2024, with a half-life pressure test successfully conducted to verify the integrity of the new seal and confirm that the structure is safe and effective for fumigation.

Smart solutions. Professional delivery. Projects up to $20m across WA.