Skip to main content

Projects

Overview

Hyden Bulk Storage Facility
Project Type Major Refurbishment Project
Facility 5500m2 Bulk Storage Facility
Location Hyden
Constructed 1980
Refurbished 2024

Hyden Bulk Storage Refurbishment

In 2024, Promako was engaged to undertake a major refurbishment of a bulk storage facility in Hyden. The purpose of the refurbishment was to extend the storages operational life by an additional 25 years and ensuring continued high-performance service.

The comprehensive scope of works included:

  • Custom design and installation of Height Safety Access System
  • High-volume washdown and thorough surface preparation
  • Removal of the existing seal using high-pressure water blasting
  • Complete removal and replacement of cladding
  • Structural repairs to critical areas
  • Application of specialised coatings to enable controlled atmosphere fumigation

Practical Completion was achieved in July 2024, with a half-life pressure test successfully conducted to verify the integrity of the new seal and confirm that the structure is safe and effective for fumigation.

Smart solutions. Professional delivery. Projects up to $20m across WA.