Skip to main content

Projects

Overview

Geraldton Conveyor Tunnels
Project Type Major Refurbishment Project
Facility 350m Long Conveyor Tunnels
Location Geraldton
Refurbished 2025

Geraldton Bulk Storage Tunnel Refurbishment

In 2025, Promako was engaged to undertake a major refurbishment of the bulk storage out-loading tunnels in the Geraldton Port Precinct. The purpose of the refurbishment was to extend the storages operational life by an additional 25 years and ensuring continued high-performance service.

The comprehensive scope of works included:

  • High-volume washdown and thorough surface preparation
  • Assist in scope development with the client.
  • Waterproof sealing and coating of concrete expansion joints to eliminate water ingress
  • Removal of the existing seal using high-pressure water blasting
  • Application of specialised coatings to tunnels to enable controlled atmosphere fumigation

Practical Completion was achieved in May 2025.

Smart solutions. Professional delivery. Projects up to $20m across WA.